Wrong Motor Sizing
A motor specified without a gate weight check will strain, slow, and fail within months of installation.
Weight-Matched Motor
The installer measures the gate’s weight and leaf length before selecting a motor rated to match.
Sliding Gate Systems
A gate that opens without swinging into the road, surveyed, sized, and installed to fit your entrance.
Getting It Right
The most common failures come from skipping the site check, not from the gate itself.
A motor specified without a gate weight check will strain, slow, and fail within months of installation.
The installer measures the gate’s weight and leaf length before selecting a motor rated to match.
A sliding gate needs clear space along the boundary, ordering without measuring that space first causes costly rework.
The site survey confirms available run-back space before any track, racking, or motor is specified.
Track laid on uneven or soft ground shifts over time, causing the gate to drag, catch, or derail.
Surface type and levelness are assessed at survey stage so groundwork is scoped into the quote upfront.
A gate automated without safety sensors fitted to current standards creates a crush risk and a liability.
Safety edges and photocells are aligned to DHF and Gate Safe standards on every installation we arrange.
Scope of Work
From track and rollers to access control and electrical sign-off, the full scope in one quote.
Ground track and roller carriage sized to the gate’s weight, with rack-and-pinion drive matched to the motor.
Motor selected by gate weight and leaf length, wired to a control panel with remote, keypad, or app access.
Photocells and safety edges fitted and aligned to DHF and Gate Safe standards as part of every installation.
Existing steel or wrought iron gates assessed for structural suitability before automation is specified.
Remote handsets, keypad entry, or intercom configured and tested before the installer leaves site.
Measured at survey to confirm gate and motor sizing.
Checked before any motor is specified or ordered.
All wiring completed to 18th Edition requirements.
Installer flags any frontage checks needed before commissioning.
Why Choose Us
Accountability from first survey to final sign-off, not just a gate dropped at the kerb.
Nothing is ordered until opening width, run-back space, and gate weight have been measured on site.
Groundwork, track, motor, wiring, and access control are quoted together, no surprise additions after work starts.
Safety edges and photocells are specified and aligned to current DHF and Gate Safe standards on every job.
All electrical work is completed to 18th Edition and Part P requirements, with documentation provided on completion.
The installer flags any frontage or height checks with the local planning authority before the gate is commissioned.
We arrange a structural check of your current gate before recommending automation or replacement, no unnecessary spend.
The Process
01
Tell us the opening width, run-back space, and access needs so we can arrange the right local installer for your site.
02
The installer visits, measures gate weight and ground conditions, then provides a written quote covering all scope.
03
Track, motor, and controls are fitted, safety sensors are aligned, and the system is tested before the installer leaves.
Pricing Estimates
| Job | Typical cost |
|---|---|
| Domestic sliding gate | £3500-£8000 |
| Standard sliding gate installation | £5000-£10000 |
| Commercial sliding gate | £10000-£20000 |
| Premium or custom sliding system | £12000-£25000 |
Describe the width, slope, and access needs and we’ll arrange a local installer to survey and quote the full job.